Conference Agenda

11th

April

Sunday

7:00 PM

Welcome Reception

12th

April

Monday

UCDS and L&A welcome you to your conference: safety exits, restrooms, UCDS and L&A staff introductions, and what this conference is about.

This session will kick off our time together and set the stage for the rest of the conference. We’ll explore how each session builds on the next to paint a complete picture of a full-lifecycle control system modernization project. Attendees will hear how UCDS and Lin & Associates first came together on a shared mission to transform control room environments around the globe. This is also a momentous occasion for UCDS as they celebrate 25 years of helping clients run safer, more effective operations.

10:00 AM

Break

Integrating Operations, consolidating control rooms, moving to a new single central control room: The UCDS scope and L&A scope exposed.

11:15 AM

Lunch

This presentation reviews the importance of reverse engineering as a critical first step in modernizing legacy control systems through a customer case study. Reverse engineering revealed how the system actually operated, not merely how it was originally documented. The resulting insight helped reduce project risk, preserve essential functionality, eliminate unnecessary complexity, and support a smoother transition to a standardized, maintainable, and future-ready control system.

Why most control room upgrade projects fail / How Borregaard Won: Explore future opportunities for improvement.

Selecting the best operators, ensuring competence, determining how many operators you need for normal operations and ensuring the workload can be managed during abnormal situations, and what about Supervision / work team design?

2:30 PM

Break

Unlike traditional APC platforms that rely on opaque mathematical models, this approach is built around operator models. Those strategies that mirror how experienced operators actually think about and manage the process. By automating the coordinated adjustments operators would otherwise perform manually, the platform reduces workload without removing the operator from the picture. The result is an APC system operators trust, understand, and actively use, keeping them in the loop while freeing them to focus on higher-value decisions.

3:30 PM

Closing Remarks

4:00 PM

Product Demos & Social Networking

13th

April

Tuesday

Review today’s agenda.

UCDS shares a success story on how display designs are developed. Display designs for normal operations and off-normal operations.

10:00 AM

Break

This presentation outlines a structured, user-centered approach to designing HMI graphics — from conducting workshops and style guides, through detailed task analysis with operators, to a multi-round QA/QC and review process that keeps end users involved at every stage, ensuring the final displays match how operators actually work rather than just what’s cheapest or most familiar to the developer.

11:15 AM

Lunch

This presentation outlines a phased approach to control system modernization (Assess, Design, Build, Test, Deploy, Sustain) emphasizing standardization, simplification, and early operator involvement. It addresses the real-world challenges of migrating systems shaped by decades of incremental changes, demonstrating that successful implementation depends on structured planning and disciplined decision-making, not just the technology chosen.

How far we’ve come but why do we still have alarm floods? How do we mitigate, manage, and handle alarm flooding?

How they help address nuisance alarms, manage rationalization efforts, and how AI is changing the way we manage and use alarms?

2:30 PM

Break

This presentation explores how industrial facilities can identify hidden weaknesses and performance gaps within Safety Instrumented Systems (SIS) before they evolve into operational or safety incidents. It highlights the use of recommended SIS lifecycle assessments, including operational and mechanical integrity reviews, lessons learned from industry incident investigations, and the adoption of emerging best practices.

3:30 PM

Closing Remarks

4:00 PM

Project Demos & Social Networking

14th

April

Wednesday

Review today’s agenda.

Applying operator-centered control room design principles globally can be a huge task. We will explore the many standards and guidelines found in ISO 11064 Part 1-6 , providing proof that a control room can be designed for all situations.

10:00 AM

Break

This presentation focuses on practical strategies for identifying, prioritizing, and closing gaps to improve operational safety, system reliability, and lifecycle performance. The session will explore real-world approaches for strengthening Safety Instrumented System (SIS) programs across refining, petrochemical, and process industry environments.

11:15 AM

Railway Excursion (Lunch Included)

3:30 PM

Railway Excursion Ends

15th

April

Thursday

Review today’s agenda.

The Pipeline CRM (Control Room Management) journey. PHMSA regulates US pipeline companies and must implement human factors in the control room. How has Control Room Resource Management (CRM) changed the industry, what does it mean, are we seeing results? How can other industries benefit from these regulations and best practices.

10:00 AM

Break

This presentation explores how training is one of the final pillars of a project and one of the most important. It is the bridge between “project completed” and “plant safely operating.” Effective training ensures that operators, engineers, and maintenance personnel can safely use their tools and truly understand the process they are controlling. Every project should end with structured, role‑specific training that transfers knowledge from the project team to the people who will use the system day‑to‑day.

11:15 AM

Lunch

This presentation outlines a structured approach to project commissioning. From planning and scope definition through testing and verification we will emphasize that commissioning is not a final step but a series of deliberate checkpoints that keep operators and controls teams involved at every stage. This will ensure the system behaves as intended under real operating conditions rather than just checking a box at the end.

How do we select the right console, when do we use a video wall? What about the number of screens, screen sizes, screen layout, KVM solutions, and how is this all integrated into the console without jeoperdizing situational awareness and human factors?

To achieve a high performance control room operation, the HMI, Alarm Management, and the design of the console and room should be an integrated approach. See examples of how UCDS uses this methodology for total control room designs, the approach, and how owner representation can reduce costly mistakes.

2:30 PM

Break

What happens when staffing levels are changed or new responsibilities are added to an operator position without first assessing the impact on workload? How do you know the operator will still have the capacity to manage abnormal or emergency situations and recover safely from off-normal events? We often understand Management of Change from a process safety perspective, but organizational changes can create risk as well. Changes to staffing, roles, spans of responsibility, supervision, or team structure can directly affect operator performance and the site’s ability to respond during critical situations.

3:30 PM

Closing Remarks

6:30 PM

Rooftop Reception & Dinner

16th

April

Friday

Guest Checkout

© 2026 UPAC Summit | Presented by User Centered Design Services and Lin & Associates Inc. All rights reserved.